Projects
Engineering Geology
From August of 2010 to October 2010, we ran all the geotechnical, hydro-geological and laboratory works together with the site investigation on the stretch of S-8 road. The following documentation constitutes the final stage of the works:
1. The project of geological works (engineering geology and hydrogeology),
2. Engineering and geological report,
3. Hydrogeological report (to the extent consistent with the methodological guide for the Ministry of Environment)
4. Recommendations on posible foundation design suitable for the site and the geotechnical aspects of site preparation,
5. Necessary laboratory test results and site investigation,
6. Site plan showing bore-hole and CPTU locations.
MoreLessFrom July 2009 to January of 2010 – we ran all the geotechnical reports, hydro-geological reports and laboratory test results together with site investigations on the stretch of A1 motorway between Tuszyn and Rząsawa. The results of the site investigations were detailed reports concerning the analyzed stretch of the A1 motorway. In addition, specific recommendations for the foundation of engineering structures were given.